Renovation Waste Removal
Renovation Waste Removal in Adelaide
Renovation waste breaks the normal rules of skip bin hire, and it catches people out in the same way every time.
A bathroom strip-out looks like nothing: two skip loads of tiles, a vanity, an old bath, some plasterboard. Then the bin gets weighed and the excess tonnage charge is more than the hire. Tiles, screed, mortar and rubble are dense. A 4m³ bin filled to the brim with them can weigh more than a 9m³ bin of household junk.
So the sizing conversation for a reno is the opposite of the one for a house clean-out. Use a smaller bin, more of them, and watch the weight.
Clean hard fill vs mixed renovation waste
This is the single biggest lever on what you pay.
Clean hard fill
is bricks, concrete, roof tiles, ceramic tiles, pavers and rubble, with nothing else mixed in. It goes to a crusher and gets turned into road base, which makes it the cheapest heavy waste stream there is.
Mixed renovation waste
is the same rubble plus timber, plasterboard, insulation, cabinetry and packaging. It has to be tipped, sorted and split, and the landfill portion carries a levy.
The difference between the two on the same bin size runs to $50–$100. If your job produces a lot of clean rubble and you can keep it separate, take two bins rather than one. That includes a slab out, a brick wall down or a floor tile lift. It usually still works out cheaper, and on a bigger job it’s not close.
One length of framing timber tossed into the hard fill bin reclassifies the whole load. Tell the crew.
Bathroom renovation waste disposal
A typical Adelaide bathroom strip-out produces 2–4m³ of waste. The mistake is booking to that volume without thinking about density.
What comes out:
Wall and floor tiles, plus the screed and mortar bed behind them, which is the heaviest component by a distance
The bath. An acrylic bath weighs next to nothing, but a cast iron bath is 100kg on its own
Toilet pan and cistern, vanity and basin
Shower base and screen glass
Plasterboard and villaboard
Waterproof membrane and old vinyl
For most bathrooms a 3m³ or 4m³ bin is the right call. That’s not because the volume needs it but because that’s what the tonnage cap allows. Fill a 6m³ bin with wet screed and tiles and you’ll pay excess weight on top of the hire.
Two practical tips:
- Get the tiles and screed into the bin flat and low rather than in a heap at one end.
- If you’re doing the strip-out yourself over a few weekends, book a longer hire rather than rushing it.
Kitchen renovations
Kitchens are the reverse: bulky but light. Cabinetry, doors, packaging and old appliances fill volume without adding much weight, so a 6m³ or 9m³ bin is usually fine.
The exception is the benchtop. Stone is dense, and a full run of it is a serious weight on its own.
On engineered stone: it can no longer be supplied or installed in Australia because cutting and grinding it releases harmful silica dust, and removing existing benchtops comes with strict dust controls. If your benchtop is engineered stone, don’t cut or grind it to make it fit the bin. Lift it out in whole slabs and let us know it’s going in.
Demolition waste removal
For demolition waste removal in Adelaide, the questions we’ll ask are about volume, material mix and access. That covers jobs like taking down a garage or shed, removing an extension or clearing a full site.
Volume
A single garage is typically 8–12m³ of mixed material. A brick garage with a concrete slab is far more once the slab is broken up, and the slab alone is usually worth a separate hard fill bin.
Materials
Bricks and concrete separate cleanly. Timber framing, roof sheeting, insulation and fibro don’t, and they change the pricing.
Access
Demo sites are often mid-job, with material stacked and vehicles in the way. If the truck can’t reach the bin, we can’t swap it. Plan the placement before the first bin lands rather than after.
Note on heavy waste sizing
We cap heavy and mixed demolition loads at 4m³. Larger bins exceed road weight limits before they’re physically full, so we’d rather do two swaps than send a truck out overweight.
Asbestos: check before you start, not after
This matters more than anything else on this page.
Adelaide has a lot of pre-1990 housing stock, and asbestos cement products turn up routinely in exactly the places renovations go:
- behind bathroom wall tiles
- under vinyl flooring, and sometimes in the backing or adhesive itself
- in eaves, garage walls and fences
- as sheeting around wet areas
You cannot tell by looking. Age and appearance are indicators, not answers. The only way to know is to have a sample tested by a NATA-accredited laboratory.
We don’t take asbestos in any of our bins. If your renovation turns some up, we’ll point you to the right people to handle it safely, and we’ll take care of the rest of your reno waste once it’s gone.
If you suspect asbestos:
- Stop work on that area. Don't cut, drill, sand or break it.
- Don't wet it down and keep going, and don't put it in a general bin.
- Get it tested.
- If it’s positive, call a licensed asbestos removalist. They’ll remove, wrap and dispose of it correctly and give you the paperwork.
Not sure who to call? Ring us and we’ll point you in the right direction.
Plasterboard
Most facilities handle gypsum plasterboard separately. When it breaks down in landfill alongside wet organic material it can produce hydrogen sulphide, so it’s diverted rather than buried.
In practice, plasterboard is fine in a mixed reno bin but will contaminate a clean hard fill load. Keep it out of the rubble bin, and mention plasterboard when you book so we can price it in.
Bin swaps for trade jobs
If you’re running a job over several weeks, you don’t want a bin sitting full and idle on site.
We do swap-outs: full bin off, empty bin on, usually within 24 hours of a call on metro jobs. It’s the same price per bin as a standard hire, with no premium for the swap itself.
For builders running multiple sites, we can hold a standing arrangement so you’re not requoting every time. Ring us and we’ll set it up.
What can't go in a renovation bin
Asbestos - We don’t accept it in any bin. Call a licensed asbestos removalist, and we’re happy to point you to one.
Paint, solvents, adhesives, sealants - These count as liquid waste, so drop them off at a hazardous waste facility.
Contaminated soil - It needs assessment and a separate disposal pathway.
Gas bottles
Fluorescent tubes - because of their mercury content.
Wet concrete
Frequently Asked Questions
How do I know what size I need?
Tell us the job (bathroom, kitchen or garage demo) and what the materials are. Density matters more than volume with reno waste, so we’ll size to the weight, not the look of the pile.
What happens if I go over the tonnage cap?
You’re charged for the excess at the weighbridge rate, which we’ll tell you before delivery. We’d rather put you in two smaller bins than surprise you.
Can I mix rubble and general reno waste?
You can, but it’s dearer. Separate them and the hard fill portion drops by $50–$100 per bin.
Do you take asbestos?
No. We don’t accept asbestos in any bin, but we’re happy to point you to a licensed removalist who can handle it.
Do I need a permit?
Only if the bin goes on the road or footpath. On site or on the driveway, no. Council permits take a few business days.
Can you deliver today?
Often, yes. See same day skip bin hire for cutoffs.
Where can I see prices?
There’s a full breakdown on our skip bin prices page, including weight allowances by bin size.
Book a renovation bin
Tell us the job, the materials and the site access. You’ll get the right size, a fixed price and a tonnage cap you can actually work to.